Shortages

Copper

Copper is a material input used in equipment, wiring and other production.

What-if model · Chosen targets, conditional projections and calculated gaps.

Conditional constraint
Calculated output blocked
$166bnin this scenario, one constraint
Range across tested cases
$144bn – $283bn3 cases; not a probability interval

This is a conditional test of the chosen target economy. It does not predict how much GDP will be lost. Changing the target mix, supply assumptions or production method can change the result.

[A] Assumednot tested (blocks 1T or less)UNTESTED
$0Cyan · tested range   Yellow · base$283bn

What is being compared?

The model allows partial substitution for copper using a constant-elasticity-of-substitution approximation. It inherits an elasticity of 0.4 and an effective conversion between missing material and blocked output from the earlier model.

Quantity2035 amount
Needed for the full target51.0
Supply on course26.5
Supply at precedent45.4

All three use the same input unit — million t refined copper per year.

Show the shortage calculation

Input shortage = maximum of zero and requirement minus supply. Coverage = supply ÷ requirement.

Supply pathInput shortfallFull-target need met
On course24.551.9%
At precedent5.689.0%

The physical shortfall and the blocked-output amount use different units. The model converts between them using each layer's input requirements and the allocation described below.

Source files · shortages_v4.csv

How this becomes blocked output

The model asks two questions. With the whole target attempted, how much tier-2 output must be removed at precedent input supply? With only on-course output and tier 1 attempted, how much tier-1 output must be removed at on-course supply? It adds the resulting tier-2 and tier-1 blocks for this shortage.

$166bn tier 2 + $0bn tier 1 = $166bn blocked

The allocation drops eligible output from the model's most input-intensive layers first and protects the on-course baseline. The ordering is fixed within a test. Labour-dependent requirements are recalculated as output is removed.

Understand the allocation and its limits
See the affected layers
LayerBase output blocked
Productive equipment$166bn

Other shortages can block these same amounts. Removing a single constraint leaves the other constraints to be tested.

Source files · own_blocks_v4.csv

What changes the answer?

Each row recomputes the constraint under a different production or demand assumption. The displayed range takes the smallest and largest output blocks across all these rows.

CaseWhat changesOutput blocked
basev3 ratio: pathway-consistent 2035 (GCMO High Demand, closest to NZE); more mineral per unit than the baseline (CES substitution, elasticity 0.4: v3's missing/output-depending conversion)$166bn
v3altv3 second ratio: IEA GCMO 2026 STEPS 2035 path (Agent 4 rerun) (CES substitution, elasticity 0.4: v3's missing/output-depending conversion)$144bn
today2026 intensity held (today's technology, no efficiency gain): x1.10 the v3 ratio (CES substitution, elasticity 0.4: v3's missing/output-depending conversion)$283bn
See its reported rank in each scenario
ScenarioRankOutput blocked
base15$166bn
AI takes cognitive tasks first17$166bn
humans keep cognitive tasks15$166bn
labour productivity on trend16$166bn
v3 second sourced ratios14$144bn
2026 intensities / K-Y trend18$283bn
land- and approval-saving technology, task reallocation14$166bn

The published ranking takes the first matching variant for each scenario. Clinical approval and cropland each have a second S6 variant that appears in the range above and is omitted from those ranking columns.

Read every scenario

What evidence would improve this?

IEA Critical Minerals Data Explorer: copper STEPS 2035 demand, secondary supply and base/high-production mine supply in kt (replaces the 2030-40 interpolation and the held 18% secondary share)

Growth and the historical comparison

World copper mine output 1954-1963 x1.625 in 9 years (USGS via OWID), post-1950 maximum; post-1985 maximum (1995-2004) x1.47 is the low case

RateAnnual growth
Needed to reach the target input6.9%
Implied by precedent supply5.5%

The growth comparison uses a nine-year interval from 2026 to 2035.

Sources and exact values

Source files · shortages_v4.csv · variants_v4.csv · own_blocks_v4.csv

base · stage1-v3/requirements/requirements.csv (ratio_2035); input_layer_v3.csv (missing, output_depending_ppp_bn)

v3alt · stage1-v3/requirements/requirements.csv (ratio_alt_2035)

today · stage1-v3/repair/agent4_bottlenecks/bottlenecks.csv (K06 supply_2026); 2026 world output (repaired baseline)

Open the input files and source registries

Copy this prompt

Copy the selected text using your keyboard or touch menu, then paste it into your assistant.