Copper https://metamachine.sukanthoriginal.com/guide/shortage-k06.html Copper is a material input used in equipment, wiring and other production. Conditional constraint (https://metamachine.sukanthoriginal.com/guide/what-the-numbers-mean.html#constraint) Calculated output blocked $166bnin this scenario, one constraint Range across tested cases $144bn – $283bn3 cases; not a probability interval This is a conditional test of the chosen target economy. It does not predict how much GDP will be lost. Changing the target mix, supply assumptions or production method can change the result. [A] Assumed (https://metamachine.sukanthoriginal.com/guide/evidence.html)not tested (blocks 1T or less) (https://metamachine.sukanthoriginal.com/guide/evidence.html)UNTESTED (https://metamachine.sukanthoriginal.com/guide/evidence.html)$0Cyan · tested range   Yellow · base$283bn What is being compared? The model allows partial substitution for copper using a constant-elasticity-of-substitution approximation. It inherits an elasticity of 0.4 and an effective conversion between missing material and blocked output from the earlier model. | Quantity | 2035 amount | Needed for the full target | 51.0 | Supply on course | 26.5 | Supply at precedent | 45.4 All three use the same input unit — million t refined copper per year. Show the shortage calculation Input shortage = maximum of zero and requirement minus supply. Coverage = supply ÷ requirement. | Supply path | Input shortfall | Full-target need met | On course | 24.5 | 51.9% | At precedent | 5.6 | 89.0% The physical shortfall and the blocked-output amount use different units. The model converts between them using each layer's input requirements and the allocation described below. Source files · shortages_v4.csv (https://metamachine.sukanthoriginal.com/data/shortages_v4.csv) How this becomes blocked output The model asks two questions. With the whole target attempted, how much tier-2 output must be removed at precedent input supply? With only on-course output and tier 1 attempted, how much tier-1 output must be removed at on-course supply? It adds the resulting tier-2 and tier-1 blocks for this shortage. $166bn tier 2 + $0bn tier 1 = $166bn blocked The allocation drops eligible output from the model's most input-intensive layers first and protects the on-course baseline. The ordering is fixed within a test. Labour-dependent requirements are recalculated as output is removed. Understand the allocation and its limits (https://metamachine.sukanthoriginal.com/guide/methods.html) See the affected layers | Layer | Base output blocked | Productive equipment (https://metamachine.sukanthoriginal.com/guide/layer-c14.html) | $166bn Other shortages can block these same amounts. Removing a single constraint leaves the other constraints to be tested. Source files · own_blocks_v4.csv (https://metamachine.sukanthoriginal.com/data/own_blocks_v4.csv) What changes the answer? Each row recomputes the constraint under a different production or demand assumption. The displayed range takes the smallest and largest output blocks across all these rows. | Case | What changes | Output blocked | base | v3 ratio: pathway-consistent 2035 (GCMO High Demand, closest to NZE); more mineral per unit than the baseline (CES substitution, elasticity 0.4: v3's missing/output-depending conversion) | $166bn | v3alt | v3 second ratio: IEA GCMO 2026 STEPS 2035 path (Agent 4 rerun) (CES substitution, elasticity 0.4: v3's missing/output-depending conversion) | $144bn | today | 2026 intensity held (today's technology, no efficiency gain): x1.10 the v3 ratio (CES substitution, elasticity 0.4: v3's missing/output-depending conversion) | $283bn See its reported rank in each scenario | Scenario | Rank | Output blocked | base | 15 | $166bn | AI takes cognitive tasks first | 17 | $166bn | humans keep cognitive tasks | 15 | $166bn | labour productivity on trend | 16 | $166bn | v3 second sourced ratios | 14 | $144bn | 2026 intensities / K-Y trend | 18 | $283bn | land- and approval-saving technology, task reallocation | 14 | $166bn The published ranking takes the first matching variant for each scenario. Clinical approval and cropland each have a second S6 variant that appears in the range above and is omitted from those ranking columns. Read every scenario (https://metamachine.sukanthoriginal.com/guide/scenarios.html) What evidence would improve this? IEA Critical Minerals Data Explorer: copper STEPS 2035 demand, secondary supply and base/high-production mine supply in kt (replaces the 2030-40 interpolation and the held 18% secondary share) Growth and the historical comparison World copper mine output 1954-1963 x1.625 in 9 years (USGS via OWID), post-1950 maximum; post-1985 maximum (1995-2004) x1.47 is the low case | Rate | Annual growth | Needed to reach the target input | 6.9% | Implied by precedent supply | 5.5% The growth comparison uses a nine-year interval from 2026 to 2035. Sources and exact values Source files · shortages_v4.csv (https://metamachine.sukanthoriginal.com/data/shortages_v4.csv) · variants_v4.csv (https://metamachine.sukanthoriginal.com/data/variants_v4.csv) · own_blocks_v4.csv (https://metamachine.sukanthoriginal.com/data/own_blocks_v4.csv) base · stage1-v3/requirements/requirements.csv (ratio_2035); input_layer_v3.csv (missing, output_depending_ppp_bn) v3alt · stage1-v3/requirements/requirements.csv (ratio_alt_2035) today · stage1-v3/repair/agent4_bottlenecks/bottlenecks.csv (K06 supply_2026); 2026 world output (repaired baseline) Open the input files and source registries (https://metamachine.sukanthoriginal.com/guide/sources.html)