Start here

Start with the question

What would it take for annual world output to double by 2035, and what could hold it back?

What-if model · Chosen targets, conditional projections and calculated gaps.

Begin with a what-if question

Imagine the world producing more meals, homes, care, transport and other services each year. This model sets a total goal of $448.5T in 2035 and asks which inputs would be required to get there.

It chooses a mix of sectors inside that goal. The baseline is a conditional projection; the tiers are gaps calculated against the chosen scenario. The animation does not mean all of that output is expected to arrive.

Distinguish targets, projections and gaps

Read the four parts of the bridge

Today + projected baseline growth + tier 1 gap + tier 2 gap = chosen target. This is an accounting breakdown of a scenario, not a prediction that the additions will happen. Neither tier is included in baseline growth.

StepAmount addedTotal annual output
TodayStarting point$224.3T
On-course growth+$41.4T$265.6T
Tier 1+$34.8T$300.4T
Tier 2+$148.1T$448.5T target

These are annual output amounts in 2026 purchasing-power dollars. Display values are rounded; totals use the unrounded values.

See the exact bridge
ComponentBillion 2026 PPP dollars
Today224,261.88100
On-course growth41,357.00288
Tier 134,757.30900
Tier 2148,147.56912
Target448,523.76203

Source files · layers_v4.csv

The grey part is today's output. Teal adds $41.4T already counted on course. Cyan adds another $34.8T in tier 1, within the chosen historical precedents. Yellow adds a further $148.1T in tier 2, beyond those precedents. Both tiers still need to be achieved.

Follow one everyday layer

Food at home starts at $12.6T. The model counts $1.5T of growth on course, $1.2T in tier 1 and $5.9T in tier 2. Together they reach its $21.2T target.

Follow the food calculation

Ask which input is short

A bakery might need flour, workers, ovens and electricity to make more bread. The model asks an equivalent question for each layer. It estimates how much of an input the target needs, compares that with supply, and translates the shortfall into output.

For physical machine labour, the base case needs 1,202.3 million worker-equivalents and has 42.9 at precedent. The output attributed to that constraint ranges from $1.1T to $102.5T across its task splits.

See why the robot estimate changes

Read the evidence and assumptions

An A label marks an assumption. SOLID means the shortage binds across the tests performed, subject to the saving exception documented in the methods. The range shows how much its size changes. These labels answer different questions.

Understand the evidence labels

Keep the open questions in view

The model leaves $41.5T unexplained under its overlap rule. Its six picks contain two SOLID estimates labelled S or E, against a requested minimum of three.

Copy this prompt

Copy the selected text using your keyboard or touch menu, then paste it into your assistant.