Shortages

Construction trades

Construction trades are the human workers required to produce the model's construction output.

What-if model · Chosen targets, conditional projections and calculated gaps.

Conditional constraint
Calculated output blocked
$16.0Tin this scenario, one constraint
Range across tested cases
$16.0T – $29.8T3 cases; not a probability interval

This is a conditional test of the chosen target economy. It does not predict how much GDP will be lost. Changing the target mix, supply assumptions or production method can change the result.

[E] EstimatedSOLIDTESTED
$0Cyan · tested range   Yellow · base$29.8T

What is being compared?

The model applies a construction-employment footprint to each layer, including construction work embodied in its supply chain. It compares total need with the workforce on course and at the fastest precedent. Alternative productivity ratios change the number of workers needed.

Quantity2035 amount
Needed for the full target571.0
Supply on course380.2
Supply at precedent495.1

All three use the same input unit — million construction workers (ISIC F) in 2035.

Show the shortage calculation

Input shortage = maximum of zero and requirement minus supply. Coverage = supply ÷ requirement.

Supply pathInput shortfallFull-target need met
On course190.866.6%
At precedent75.986.7%

The physical shortfall and the blocked-output amount use different units. The model converts between them using each layer's input requirements and the allocation described below.

Source files · shortages_v4.csv

How this becomes blocked output

The model asks two questions. With the whole target attempted, how much tier-2 output must be removed at precedent input supply? With only on-course output and tier 1 attempted, how much tier-1 output must be removed at on-course supply? It adds the resulting tier-2 and tier-1 blocks for this shortage.

$15.4T tier 2 + $612bn tier 1 = $16.0T blocked

The allocation drops eligible output from the model's most input-intensive layers first and protects the on-course baseline. The ordering is fixed within a test. Labour-dependent requirements are recalculated as output is removed.

Understand the allocation and its limits
See the affected layers
LayerBase output blocked
Built structures$16.0T

Other shortages can block these same amounts. Removing a single constraint leaves the other constraints to be tested.

Source files · own_blocks_v4.csv

What changes the answer?

Each row recomputes the constraint under a different production or demand assumption. The displayed range takes the smallest and largest output blocks across all these rows.

CaseWhat changesOutput blocked
basev3 ratio: best achievable 2035 (fastest sourced productivity)$16.0T
v3altv3 second ratio: construction output per worker on its 2014-24 trend (Agent 4 rerun)$25.4T
today2026 intensity held (today's technology, no efficiency gain): x1.08 the v3 ratio$29.8T
See its reported rank in each scenario
ScenarioRankOutput blocked
base6$16.0T
AI takes cognitive tasks first10$16.0T
humans keep cognitive tasks6$16.0T
labour productivity on trend7$16.0T
v3 second sourced ratios3$25.4T
2026 intensities / K-Y trend7$29.8T
land- and approval-saving technology, task reallocation4$16.0T

The published ranking takes the first matching variant for each scenario. Clinical approval and cropland each have a second S6 variant that appears in the range above and is omitted from those ranking columns.

Read every scenario
Growth and the historical comparison

World construction employment at its fastest 9-year growth (ILO, 2002-2011, 5.36%/yr) from 2026

RateAnnual growth
Needed to reach the target input7.0%
Implied by precedent supply5.4%

The growth comparison uses a nine-year interval from 2026 to 2035.

Sources and exact values

Source files · shortages_v4.csv · variants_v4.csv · own_blocks_v4.csv

base · stage1-v3/requirements/requirements.csv (ratio_2035)

v3alt · stage1-v3/requirements/requirements.csv (ratio_alt_2035)

today · stage1-v3/repair/agent4_bottlenecks/bottlenecks.csv (K17 supply_2026); 2026 world output (repaired baseline)