Shortages
Transformers and grid equipment
Transformers and grid equipment are needed to connect and deliver electricity.
What-if model · Chosen targets, conditional projections and calculated gaps.
Conditional constraint- Calculated output blocked
- $32.4Tin this scenario, one constraint
- Range across tested cases
- $5.5T – $42.6T5 cases; not a probability interval
This is a conditional test of the chosen target economy. It does not predict how much GDP will be lost. Changing the target mix, supply assumptions or production method can change the result.
What is being compared?
The model measures their capacity by the annual generation they can connect, in terawatt-hours. This is a throughput proxy for equipment capacity. It includes electricity demanded by the model's chosen mix of human and machine work.
| Quantity | 2035 amount |
|---|---|
| Needed for the full target | 74,059.0 |
| Supply on course | 42,553.3 |
| Supply at precedent | 73,055.4 |
All three use the same input unit — TWh per year of generation the delivered transformers can connect.
Show the shortage calculation
Input shortage = maximum of zero and requirement minus supply. Coverage = supply ÷ requirement.
| Supply path | Input shortfall | Full-target need met |
|---|---|---|
| On course | 31,505.7 | 57.5% |
| At precedent | 1,003.6 | 98.6% |
The physical shortfall and the blocked-output amount use different units. The model converts between them using each layer's input requirements and the allocation described below.
Source files · shortages_v4.csv
How this becomes blocked output
The model asks two questions. With the whole target attempted, how much tier-2 output must be removed at precedent input supply? With only on-course output and tier 1 attempted, how much tier-1 output must be removed at on-course supply? It adds the resulting tier-2 and tier-1 blocks for this shortage.
$2.1T tier 2 + $30.4T tier 1 = $32.4T blocked
The allocation drops eligible output from the model's most input-intensive layers first and protects the on-course baseline. The ordering is fixed within a test. Labour-dependent requirements are recalculated as output is removed.
Understand the allocation and its limitsSee the affected layers
| Layer | Base output blocked |
|---|---|
| Built structures | $8.7T |
| Mobility | $5.3T |
| Productive equipment | $3.4T |
| Public services | $3.0T |
| Shelter and utilities | $2.7T |
| Personal and financial services | $1.8T |
| Recreation | $1.6T |
| Household equipment | $1.5T |
| Food service, lodging | $1.4T |
| Knowledge and software | $1.3T |
| Food at home | $1.2T |
| Clothing | $447bn |
| Alcohol, tobacco, narcotics | $57bn |
| Inventories | $32bn |
Other shortages can block these same amounts. Removing a single constraint leaves the other constraints to be tested.
Source files · own_blocks_v4.csv
What changes the answer?
Each row recomputes the constraint under a different production or demand assumption. The displayed range takes the smallest and largest output blocks across all these rows.
| Case | What changes | Output blocked |
|---|---|---|
| base | IEA NZE footprint + machine-labour electricity, task split: v3 split: humans spread over all tasks; the gap split cognitive (AI) / physical (robots) by each layer's high-skill share | $32.4T |
| cogfirst | IEA NZE footprint + machine-labour electricity, task split: AI agents take every cognitive task first; humans move to physical tasks; robots only for physical work beyond them | $42.6T |
| humanscog | IEA NZE footprint + machine-labour electricity, task split: humans keep the cognitive tasks; AI adds no work; robots fill the whole gap | $30.4T |
| trendprod | IEA NZE footprint + machine-labour electricity, task split: v3 split, with output per worker on its trend (Agent 4 2035 intensity) instead of each sector's fastest 9-year growth | $33.8T |
| v3alt | IEA STEPS 2035 footprint (v3 second ratio) + machine-labour electricity (v3 split) | $5.5T |
See its reported rank in each scenario
| Scenario | Rank | Output blocked |
|---|---|---|
| base | 3 | $32.4T |
| AI takes cognitive tasks first | 2 | $42.6T |
| humans keep cognitive tasks | 3 | $30.4T |
| labour productivity on trend | 3 | $33.8T |
| v3 second sourced ratios | 9 | $5.5T |
| 2026 intensities / K-Y trend | 6 | $32.4T |
| land- and approval-saving technology, task reallocation | 3 | $32.4T |
The published ranking takes the first matching variant for each scenario. Clinical approval and cropland each have a second S6 variant that appears in the range above and is omitted from those ranking columns.
Read every scenarioWhat evidence would improve this?
World transformer manufacturing capacity by region (Wood Mackenzie / IEA grid supply-chain report) and order books to 2030
Growth and the historical comparison
US generator step-up transformer demand x3.74 in 6 years (2019-25, Wood Mackenzie via pv magazine) used as the supply ramp from the STEPS addition rate
| Rate | Annual growth |
|---|---|
| Needed to reach the target input | 9.5% |
| Implied by precedent supply | 9.3% |
The growth comparison uses a nine-year interval from 2026 to 2035.
Sources and exact values
Source files · shortages_v4.csv · variants_v4.csv · own_blocks_v4.csv
base · stage1-v3/requirements/requirements.csv (K01 ratio_2035, net of machine-labour electricity); stage1-v3/requirements/requirements.csv (K18 work_ratio_2035); stage1-v3/repair/agent4_bottlenecks/work/model_memo.json (cog, gw_per_we); stage1-v3/repair/agent4_bottlenecks/work/need_by_layer.csv (K03, K04 on course); stage1-v3/requirements/model_constants.csv (MK13, MK14)
cogfirst · stage1-v3/requirements/requirements.csv (K01 ratio_2035, net of machine-labour electricity); stage1-v3/requirements/requirements.csv (K18 work_ratio_2035); stage1-v3/repair/agent4_bottlenecks/work/model_memo.json (cog, gw_per_we); stage1-v3/repair/agent4_bottlenecks/work/need_by_layer.csv (K03, K04 on course); stage1-v3/requirements/model_constants.csv (MK13, MK14)
humanscog · stage1-v3/requirements/requirements.csv (K01 ratio_2035, net of machine-labour electricity); stage1-v3/requirements/requirements.csv (K18 work_ratio_2035); stage1-v3/repair/agent4_bottlenecks/work/model_memo.json (cog, gw_per_we); stage1-v3/repair/agent4_bottlenecks/work/need_by_layer.csv (K03, K04 on course); stage1-v3/requirements/model_constants.csv (MK13, MK14)
trendprod · stage1-v3/requirements/requirements.csv (K01 ratio_2035, net of machine-labour electricity); stage1-v3/requirements/requirements.csv (K18 work_ratio_2035); stage1-v3/repair/agent4_bottlenecks/work/model_memo.json (cog, gw_per_we); stage1-v3/repair/agent4_bottlenecks/work/need_by_layer.csv (K03, K04 on course); stage1-v3/requirements/model_constants.csv (MK13, MK14)
v3alt · stage1-v3/requirements/requirements.csv (K01 ratio_alt_2035)
Open the input files and source registries