Shortages
Grid connection approval
Grid connection approval is the ability to connect the electricity generation required by the model.
What-if model · Chosen targets, conditional projections and calculated gaps.
Conditional constraint- Calculated output blocked
- $13.1Tin this scenario, one constraint
- Range across tested cases
- $254bn – $34.8T5 cases; not a probability interval
This is a conditional test of the chosen target economy. It does not predict how much GDP will be lost. Changing the target mix, supply assumptions or production method can change the result.
What is being compared?
Its need follows the electricity requirement, while its supply follows the connection-approval path. Generation, connections and transformers can constrain the same output.
| Quantity | 2035 amount |
|---|---|
| Needed for the full target | 74,059.0 |
| Supply on course | 44,274.0 |
| Supply at precedent | 87,637.2 |
All three use the same input unit — TWh per year of generation connected.
Show the shortage calculation
Input shortage = maximum of zero and requirement minus supply. Coverage = supply ÷ requirement.
| Supply path | Input shortfall | Full-target need met |
|---|---|---|
| On course | 29,785.0 | 59.8% |
| At precedent | 0.0 | 118.3% |
The physical shortfall and the blocked-output amount use different units. The model converts between them using each layer's input requirements and the allocation described below.
Source files · shortages_v4.csv
How this becomes blocked output
The model asks two questions. With the whole target attempted, how much tier-2 output must be removed at precedent input supply? With only on-course output and tier 1 attempted, how much tier-1 output must be removed at on-course supply? It adds the resulting tier-2 and tier-1 blocks for this shortage.
$0bn tier 2 + $13.1T tier 1 = $13.1T blocked
The allocation drops eligible output from the model's most input-intensive layers first and protects the on-course baseline. The ordering is fixed within a test. Labour-dependent requirements are recalculated as output is removed.
Understand the allocation and its limitsSee the affected layers
| Layer | Base output blocked |
|---|---|
| Mobility | $5.3T |
| Productive equipment | $3.4T |
| Household equipment | $1.5T |
| Food at home | $1.2T |
| Shelter and utilities | $627bn |
| Recreation | $550bn |
| Clothing | $447bn |
| Inventories | $32bn |
Other shortages can block these same amounts. Removing a single constraint leaves the other constraints to be tested.
Source files · own_blocks_v4.csv
What changes the answer?
Each row recomputes the constraint under a different production or demand assumption. The displayed range takes the smallest and largest output blocks across all these rows.
| Case | What changes | Output blocked |
|---|---|---|
| base | IEA NZE footprint + machine-labour electricity, task split: v3 split: humans spread over all tasks; the gap split cognitive (AI) / physical (robots) by each layer's high-skill share | $13.1T |
| cogfirst | IEA NZE footprint + machine-labour electricity, task split: AI agents take every cognitive task first; humans move to physical tasks; robots only for physical work beyond them | $34.8T |
| humanscog | IEA NZE footprint + machine-labour electricity, task split: humans keep the cognitive tasks; AI adds no work; robots fill the whole gap | $13.1T |
| trendprod | IEA NZE footprint + machine-labour electricity, task split: v3 split, with output per worker on its trend (Agent 4 2035 intensity) instead of each sector's fastest 9-year growth | $13.3T |
| v3alt | IEA STEPS 2035 footprint (v3 second ratio) + machine-labour electricity (v3 split) | $254bn |
See its reported rank in each scenario
| Scenario | Rank | Output blocked |
|---|---|---|
| base | 9 | $13.1T |
| AI takes cognitive tasks first | 3 | $34.8T |
| humans keep cognitive tasks | 8 | $13.1T |
| labour productivity on trend | 9 | $13.3T |
| v3 second sourced ratios | 12 | $254bn |
| 2026 intensities / K-Y trend | 14 | $13.1T |
| land- and approval-saving technology, task reallocation | 6 | $13.1T |
The published ranking takes the first matching variant for each scenario. Clinical approval and cropland each have a second S6 variant that appears in the range above and is omitted from those ranking columns.
Read every scenarioWhat evidence would improve this?
ENTSO-E and LBNL completion rates by request year; IEA count of 2 800 GW waiting by region and age
Growth and the historical comparison
US 2008 queue speed (22 months request-to-operation, LBNL) in queue-bound grids (US+EU share of 2025 generation); STEPS path assumed connected
| Rate | Annual growth |
|---|---|
| Needed to reach the target input | 9.5% |
| Implied by precedent supply | 11.5% |
The growth comparison uses a nine-year interval from 2026 to 2035.
Sources and exact values
Source files · shortages_v4.csv · variants_v4.csv · own_blocks_v4.csv
base · stage1-v3/requirements/requirements.csv (K01 ratio_2035, net of machine-labour electricity); stage1-v3/requirements/requirements.csv (K18 work_ratio_2035); stage1-v3/repair/agent4_bottlenecks/work/model_memo.json (cog, gw_per_we); stage1-v3/repair/agent4_bottlenecks/work/need_by_layer.csv (K03, K04 on course); stage1-v3/requirements/model_constants.csv (MK13, MK14)
cogfirst · stage1-v3/requirements/requirements.csv (K01 ratio_2035, net of machine-labour electricity); stage1-v3/requirements/requirements.csv (K18 work_ratio_2035); stage1-v3/repair/agent4_bottlenecks/work/model_memo.json (cog, gw_per_we); stage1-v3/repair/agent4_bottlenecks/work/need_by_layer.csv (K03, K04 on course); stage1-v3/requirements/model_constants.csv (MK13, MK14)
humanscog · stage1-v3/requirements/requirements.csv (K01 ratio_2035, net of machine-labour electricity); stage1-v3/requirements/requirements.csv (K18 work_ratio_2035); stage1-v3/repair/agent4_bottlenecks/work/model_memo.json (cog, gw_per_we); stage1-v3/repair/agent4_bottlenecks/work/need_by_layer.csv (K03, K04 on course); stage1-v3/requirements/model_constants.csv (MK13, MK14)
trendprod · stage1-v3/requirements/requirements.csv (K01 ratio_2035, net of machine-labour electricity); stage1-v3/requirements/requirements.csv (K18 work_ratio_2035); stage1-v3/repair/agent4_bottlenecks/work/model_memo.json (cog, gw_per_we); stage1-v3/repair/agent4_bottlenecks/work/need_by_layer.csv (K03, K04 on course); stage1-v3/requirements/model_constants.csv (MK13, MK14)
v3alt · stage1-v3/requirements/requirements.csv (K01 ratio_alt_2035)