Shortages
Building permission
Building permission is the amount of construction the model assumes can receive the required permission.
What-if model · Chosen targets, conditional projections and calculated gaps.
Conditional constraint- Calculated output blocked
- $1.1Tin this scenario, one constraint
- Range across tested cases
- $1.1T – $1.1T1 cases; not a probability interval
This is a conditional test of the chosen target economy. It does not predict how much GDP will be lost. Changing the target mix, supply assumptions or production method can change the result.
What is being compared?
The unit is the value of construction permitted. It acts as a proxy for regulatory throughput. The current data include only the base production case for this shortage.
| Quantity | 2035 amount |
|---|---|
| Needed for the full target | 105,727.5 |
| Supply on course | 94,403.4 |
| Supply at precedent | 104,600.5 |
All three use the same input unit — bn 2026 int$ of construction (C13) that must be permitted in 2035.
Show the shortage calculation
Input shortage = maximum of zero and requirement minus supply. Coverage = supply ÷ requirement.
| Supply path | Input shortfall | Full-target need met |
|---|---|---|
| On course | 11,324.1 | 89.3% |
| At precedent | 1,127.0 | 98.9% |
The physical shortfall and the blocked-output amount use different units. The model converts between them using each layer's input requirements and the allocation described below.
Source files · shortages_v4.csv
How this becomes blocked output
The model asks two questions. With the whole target attempted, how much tier-2 output must be removed at precedent input supply? With only on-course output and tier 1 attempted, how much tier-1 output must be removed at on-course supply? It adds the resulting tier-2 and tier-1 blocks for this shortage.
$1.1T tier 2 + $0bn tier 1 = $1.1T blocked
The allocation drops eligible output from the model's most input-intensive layers first and protects the on-course baseline. The ordering is fixed within a test. Labour-dependent requirements are recalculated as output is removed.
Understand the allocation and its limitsSee the affected layers
| Layer | Base output blocked |
|---|---|
| Built structures | $1.1T |
Other shortages can block these same amounts. Removing a single constraint leaves the other constraints to be tested.
Source files · own_blocks_v4.csv
What changes the answer?
Each row recomputes the constraint under a different production or demand assumption. The displayed range takes the smallest and largest output blocks across all these rows.
| Case | What changes | Output blocked |
|---|---|---|
| base | v3 ratio: identity | $1.1T |
Assumption behind the verdict
fewer than two sourced alternative ways found; rests on the base ratio
See its reported rank in each scenario
| Scenario | Rank | Output blocked |
|---|---|---|
| base | 13 | $1.1T |
| AI takes cognitive tasks first | 15 | $1.1T |
| humans keep cognitive tasks | 13 | $1.1T |
| labour productivity on trend | 14 | $1.1T |
| v3 second sourced ratios | 11 | $1.1T |
| 2026 intensities / K-Y trend | 17 | $1.1T |
| land- and approval-saving technology, task reallocation | 12 | $1.1T |
The published ranking takes the first matching variant for each scenario. Clinical approval and cropland each have a second S6 variant that appears in the range above and is omitted from those ranking columns.
Read every scenarioWhat evidence would improve this?
Open the Auckland upzoning working paper (Greenaway-McGrevy and Phillips) and OECD housing-supply elasticities by metro weighted by ICP construction spend
Growth and the historical comparison
Auckland 2016 upzoning (+50% consents within 5 years, A4:A05) in the 30% of construction under discretionary permission (A4:A04); outside it current rules permit any amount (Agent 4 capped that part at capacity)
| Rate | Annual growth |
|---|---|
| Needed to reach the target input | 7.7% |
| Implied by precedent supply | 7.6% |
The growth comparison uses a nine-year interval from 2026 to 2035.
Sources and exact values
Source files · shortages_v4.csv · variants_v4.csv · own_blocks_v4.csv
base · stage1-v3/requirements/requirements.csv (ratio_2035)
Open the input files and source registries