Shortages
Cement
Cement is an input to construction and related production.
What-if model · Chosen targets, conditional projections and calculated gaps.
Conditional constraint- Calculated output blocked
- $0bnin this scenario, one constraint
- Range across tested cases
- $0bn – $0.0m3 cases; not a probability interval
This is a conditional test of the chosen target economy. It does not predict how much GDP will be lost. Changing the target mix, supply assumptions or production method can change the result.
What is being compared?
The model compares annual cement need with the supply paths. Its output estimate depends on how cement-intensive the target economy is.
| Quantity | 2035 amount |
|---|---|
| Needed for the full target | 5,589.7 |
| Supply on course | 5,428.6 |
| Supply at precedent | 7,528.7 |
All three use the same input unit — Mt cement per year.
Show the shortage calculation
Input shortage = maximum of zero and requirement minus supply. Coverage = supply ÷ requirement.
| Supply path | Input shortfall | Full-target need met |
|---|---|---|
| On course | 161.1 | 97.1% |
| At precedent | 0.0 | 134.7% |
The physical shortfall and the blocked-output amount use different units. The model converts between them using each layer's input requirements and the allocation described below.
Source files · shortages_v4.csv
How this becomes blocked output
The model asks two questions. With the whole target attempted, how much tier-2 output must be removed at precedent input supply? With only on-course output and tier 1 attempted, how much tier-1 output must be removed at on-course supply? It adds the resulting tier-2 and tier-1 blocks for this shortage.
$0bn tier 2 + $0bn tier 1 = $0bn blocked
The allocation drops eligible output from the model's most input-intensive layers first and protects the on-course baseline. The ordering is fixed within a test. Labour-dependent requirements are recalculated as output is removed.
Understand the allocation and its limitsWhat changes the answer?
Each row recomputes the constraint under a different production or demand assumption. The displayed range takes the smallest and largest output blocks across all these rows.
| Case | What changes | Output blocked |
|---|---|---|
| base | v3 ratio: best achievable 2035 (IEA NZE) | $0bn |
| v3alt | v3 second ratio: Agent 4 rerun: 2026 intensity held outside C13; C13 at the baseline on-course tonnes per unit of value | $0bn |
| today | 2026 intensity held (today's technology, no efficiency gain): x1.35 the v3 ratio | $0.0m |
Assumption behind the verdict
v3 ratio: best achievable 2035 (IEA NZE); v3 second ratio: Agent 4 rerun: 2026 intensity held outside C13; C13 at the baseline on-course tonnes per unit of value; 2026 intensity held (today's technology, no efficiency gain): x1.35 the v3 ratio
What evidence would improve this?
GCCA/USGS world cement capacity and clinker factor (replaces A03); USGS regional cement 2026
Growth and the historical comparison
World cement 2002-2011 x2.00 in 9 years (USGS MCS 2004 and 2013)
| Rate | Annual growth |
|---|---|
| Needed to reach the target input | 4.5% |
| Implied by precedent supply | 8.0% |
The growth comparison uses a nine-year interval from 2026 to 2035.
Sources and exact values
Source files · shortages_v4.csv · variants_v4.csv · own_blocks_v4.csv
base · stage1-v3/requirements/requirements.csv (ratio_2035)
v3alt · stage1-v3/requirements/requirements.csv (ratio_alt_2035)
today · stage1-v3/repair/agent4_bottlenecks/bottlenecks.csv (K10 supply_2026); 2026 world output (repaired baseline)
Open the input files and source registries