Shortages
Steel
Steel is a material used across structures, machinery and other goods.
What-if model · Chosen targets, conditional projections and calculated gaps.
Conditional constraint- Calculated output blocked
- $0bnin this scenario, one constraint
- Range across tested cases
- $0bn – $18.9T3 cases; not a probability interval
This is a conditional test of the chosen target economy. It does not predict how much GDP will be lost. Changing the target mix, supply assumptions or production method can change the result.
What is being compared?
Each production alternative changes the steel intensity of the target output. The requirement is compared with annual crude-steel supply.
| Quantity | 2035 amount |
|---|---|
| Needed for the full target | 2,901.9 |
| Supply on course | 2,570.4 |
| Supply at precedent | 3,135.5 |
All three use the same input unit — Mt crude steel per year.
Show the shortage calculation
Input shortage = maximum of zero and requirement minus supply. Coverage = supply ÷ requirement.
| Supply path | Input shortfall | Full-target need met |
|---|---|---|
| On course | 331.5 | 88.6% |
| At precedent | 0.0 | 108.1% |
The physical shortfall and the blocked-output amount use different units. The model converts between them using each layer's input requirements and the allocation described below.
Source files · shortages_v4.csv
How this becomes blocked output
The model asks two questions. With the whole target attempted, how much tier-2 output must be removed at precedent input supply? With only on-course output and tier 1 attempted, how much tier-1 output must be removed at on-course supply? It adds the resulting tier-2 and tier-1 blocks for this shortage.
$0bn tier 2 + $0bn tier 1 = $0bn blocked
The allocation drops eligible output from the model's most input-intensive layers first and protects the on-course baseline. The ordering is fixed within a test. Labour-dependent requirements are recalculated as output is removed.
Understand the allocation and its limitsWhat changes the answer?
Each row recomputes the constraint under a different production or demand assumption. The displayed range takes the smallest and largest output blocks across all these rows.
| Case | What changes | Output blocked |
|---|---|---|
| base | v3 ratio: best achievable 2035 (IEA NZE material efficiency) | $0bn |
| v3alt | v3 second ratio: IEA STEPS 2035 path (Agent 4 rerun) | $0bn |
| today | 2026 intensity held (today's technology, no efficiency gain): x1.29 the v3 ratio | $18.9T |
Assumption behind the verdict
binds only under: 2026 intensity held (today's technology, no efficiency gain): x1.29 the v3 ratio
See its reported rank in each scenario
| Scenario | Rank | Output blocked |
|---|---|---|
| base | 16 | $0bn |
| AI takes cognitive tasks first | 18 | $0bn |
| humans keep cognitive tasks | 16 | $0bn |
| labour productivity on trend | 17 | $0bn |
| v3 second sourced ratios | 15 | $0bn |
| 2026 intensities / K-Y trend | 11 | $18.9T |
| land- and approval-saving technology, task reallocation | 15 | $0bn |
The published ranking takes the first matching variant for each scenario. Clinical approval and cropland each have a second S6 variant that appears in the range above and is omitted from those ranking columns.
Read every scenarioGrowth and the historical comparison
World crude steel 2002-2011 x1.68 in 9 years (worldsteel Steel Statistical Yearbook 2012)
| Rate | Annual growth |
|---|---|
| Needed to reach the target input | 5.0% |
| Implied by precedent supply | 5.9% |
The growth comparison uses a nine-year interval from 2026 to 2035.
Sources and exact values
Source files · shortages_v4.csv · variants_v4.csv · own_blocks_v4.csv
base · stage1-v3/requirements/requirements.csv (ratio_2035)
v3alt · stage1-v3/requirements/requirements.csv (ratio_alt_2035)
today · stage1-v3/repair/agent4_bottlenecks/bottlenecks.csv (K09 supply_2026); 2026 world output (repaired baseline)
Open the input files and source registries