Shortages
Machine cognition (AI agents)
Machine cognition is the cognitive work assigned to AI agents in the model.
What-if model · Chosen targets, conditional projections and calculated gaps.
Conditional constraint- Calculated output blocked
- $0bnin this scenario, one constraint
- Range across tested cases
- $0bn – $34.8T4 cases; not a probability interval
This is a conditional test of the chosen target economy. It does not predict how much GDP will be lost. Changing the target mix, supply assumptions or production method can change the result.
What is being compared?
A worker-equivalent represents an amount of work comparable to a worker's annual contribution. The task-split alternatives change how much cognitive work people and AI perform. The model expresses AI supply in this common work unit.
| Quantity | 2035 amount |
|---|---|
| Needed for the full target | 537.1 |
| Supply on course | 310.3 |
| Supply at precedent | 45,732.6 |
All three use the same input unit — million worker-equivalents in 2035.
Show the shortage calculation
Input shortage = maximum of zero and requirement minus supply. Coverage = supply ÷ requirement.
| Supply path | Input shortfall | Full-target need met |
|---|---|---|
| On course | 226.8 | 57.8% |
| At precedent | 0.0 | 8515.4% |
The physical shortfall and the blocked-output amount use different units. The model converts between them using each layer's input requirements and the allocation described below.
Source files · shortages_v4.csv
How this becomes blocked output
The model asks two questions. With the whole target attempted, how much tier-2 output must be removed at precedent input supply? With only on-course output and tier 1 attempted, how much tier-1 output must be removed at on-course supply? It adds the resulting tier-2 and tier-1 blocks for this shortage.
$0bn tier 2 + $0bn tier 1 = $0bn blocked
The allocation drops eligible output from the model's most input-intensive layers first and protects the on-course baseline. The ordering is fixed within a test. Labour-dependent requirements are recalculated as output is removed.
Understand the allocation and its limitsWhat changes the answer?
Each row recomputes the constraint under a different production or demand assumption. The displayed range takes the smallest and largest output blocks across all these rows.
| Case | What changes | Output blocked |
|---|---|---|
| base | v3 split: humans spread over all tasks; the gap split cognitive (AI) / physical (robots) by each layer's high-skill share | $0bn |
| cogfirst | AI agents take every cognitive task first; humans move to physical tasks; robots only for physical work beyond them | $34.8T |
| humanscog | humans keep the cognitive tasks; AI adds no work; robots fill the whole gap | $0bn |
| trendprod | v3 split, with output per worker on its trend (Agent 4 2035 intensity) instead of each sector's fastest 9-year growth | $0bn |
Assumption behind the verdict
binds only under: AI agents take every cognitive task first; humans move to physical tasks; robots only for physical work beyond them
See its reported rank in each scenario
| Scenario | Rank | Output blocked |
|---|---|---|
| base | 16 | $0bn |
| AI takes cognitive tasks first | 3 | $34.8T |
| humans keep cognitive tasks | 16 | $0bn |
| labour productivity on trend | 17 | $0bn |
| v3 second sourced ratios | 15 | $0bn |
| 2026 intensities / K-Y trend | 19 | $0bn |
| land- and approval-saving technology, task reallocation | 15 | $0bn |
The published ranking takes the first matching variant for each scenario. Clinical approval and cropland each have a second S6 variant that appears in the range above and is omitted from those ranking columns.
Read every scenarioWhat evidence would improve this?
Task-matched benchmark of agent-hours per human-hour on real jobs (GDPval/METR); Epoch agent-population update with 2028-30 shipments
Growth and the historical comparison
AI chip power sold grew x1.87 in 2025 (Epoch), held 2028-2035 on top of the through-2027 fleet
| Rate | Annual growth |
|---|---|
| Needed to reach the target input | 17.7% |
| Implied by precedent supply | 92.9% |
The growth comparison uses a nine-year interval from 2026 to 2035.
Sources and exact values
Source files · shortages_v4.csv · variants_v4.csv · own_blocks_v4.csv
base · stage1-v3/requirements/requirements.csv (K18 work_ratio_2035); stage1-v3/repair/agent4_bottlenecks/work/model_memo.json (cog, gw_per_we); stage1-v3/repair/agent4_bottlenecks/work/need_by_layer.csv (K03, K04 on course); stage1-v3/requirements/model_constants.csv (MK13, MK14)
cogfirst · stage1-v3/requirements/requirements.csv (K18 work_ratio_2035); stage1-v3/repair/agent4_bottlenecks/work/model_memo.json (cog, gw_per_we); stage1-v3/repair/agent4_bottlenecks/work/need_by_layer.csv (K03, K04 on course); stage1-v3/requirements/model_constants.csv (MK13, MK14)
humanscog · stage1-v3/requirements/requirements.csv (K18 work_ratio_2035); stage1-v3/repair/agent4_bottlenecks/work/model_memo.json (cog, gw_per_we); stage1-v3/repair/agent4_bottlenecks/work/need_by_layer.csv (K03, K04 on course); stage1-v3/requirements/model_constants.csv (MK13, MK14)
trendprod · stage1-v3/requirements/requirements.csv (K18 work_ratio_2035); stage1-v3/repair/agent4_bottlenecks/work/model_memo.json (cog, gw_per_we); stage1-v3/repair/agent4_bottlenecks/work/need_by_layer.csv (K03, K04 on course); stage1-v3/requirements/model_constants.csv (MK13, MK14)
Open the input files and source registries