A what-if model, not a prediction
https://metamachine.sukanthoriginal.com/guide/what-the-numbers-mean.html

Read each number according to its role: estimate, chosen target, conditional projection, historical comparison or calculated gap.

1. Choose a goalDouble output and choose a mix of sectors.

2. Build comparisonsUse data, baseline assumptions and selected past growth rates.

3. Calculate the gapsAsk which inputs the chosen scenario would need.

This asks: if we wanted this economy, what would have to change? The animation follows the accounting, not a timeline of events that the model predicts will happen.

Estimate today

$224.3T in 2026

An estimate of annual output at the 2026 starting point.

Conditional projection

$265.6T baseline in 2035

The 2035 baseline if the model's trend, adoption and input assumptions hold. This is what on course means here.

Chosen scenario

$448.5T chosen world target

A goal and a chosen mix of sectors to test. It is not a prediction of future output or demand.

Historical-benchmark comparison

$300.4T baseline + tier 1

A conditional calculation using selected past production, employment, productivity or investment rates, proxies and input constraints. These examples need not have occurred together. Accounting rows use bookkeeping assumptions. This is not a physical limit or a guaranteed achievable path.

Calculated gap

$148.1T remaining tier 2 gap

A difference between the chosen target and the model's comparison levels. Changing the target or assumptions changes the gap.

Conditional constraint

Each shortage's own blocked-output test

Output removed when testing one shortage in the chosen scenario. It is not a forecast of lost GDP, and different shortages can overlap.

A concrete example: construction

The model assigns construction a chosen target of $105.7T. Its conditional baseline is $62.4T, and its selected historical-benchmark comparison reaches $71.1T. The $34.6T tier 2 number is $105.7T minus $71.1T. It is the gap under those choices, not an observation of missing construction or a forecast of future growth.
Trace all three construction numbers and their assumptions → (https://metamachine.sukanthoriginal.com/guide/layer-c13.html)

Evidence labels answer a different question

S, E and A describe the provenance recorded by the source model. They do not tell you whether a number is a target, projection or gap. A target labelled E is still a chosen scenario. Some targets also contain default assumptions despite an inherited E label; the sector pages make those defaults visible. SOLID means a constraint persisted across the cases tried, subject to documented exceptions; it is not a forecast probability.
Read the source labels and testing limits (https://metamachine.sukanthoriginal.com/guide/evidence.html)

Source files · layers_v4.csv (https://metamachine.sukanthoriginal.com/data/layers_v4.csv) · inputs/stage1-v3/requirements/target_economy.csv (https://metamachine.sukanthoriginal.com/data/inputs/stage1-v3/requirements/target_economy.csv) · inputs/stage1-v3/requirements/report.md (https://metamachine.sukanthoriginal.com/data/inputs/stage1-v3/requirements/report.md)
