Building permission
https://metamachine.sukanthoriginal.com/guide/shortage-k12.html

Building permission is the amount of construction the model assumes can receive the required permission.

Conditional constraint (https://metamachine.sukanthoriginal.com/guide/what-the-numbers-mean.html#constraint)
Calculated output blocked
$1.1Tin this scenario, one constraint

Range across tested cases
$1.1T – $1.1T1 cases; not a probability interval

This is a conditional test of the chosen target economy. It does not predict how much GDP will be lost. Changing the target mix, supply assumptions or production method can change the result.
[A] Assumed (https://metamachine.sukanthoriginal.com/guide/evidence.html)SCENARIO (https://metamachine.sukanthoriginal.com/guide/evidence.html)UNTESTED (https://metamachine.sukanthoriginal.com/guide/evidence.html)$0Cyan · tested range   Yellow · base$1.1T

What is being compared?

The unit is the value of construction permitted. It acts as a proxy for regulatory throughput. The current data include only the base production case for this shortage.

 | Quantity | 2035 amount

 | Needed for the full target | 105,727.5

 | Supply on course | 94,403.4

 | Supply at precedent | 104,600.5

All three use the same input unit — bn 2026 int$ of construction (C13) that must be permitted in 2035.

Show the shortage calculation

Input shortage = maximum of zero and requirement minus supply. Coverage = supply ÷ requirement.

 | Supply path | Input shortfall | Full-target need met

 | On course | 11,324.1 | 89.3%

 | At precedent | 1,127.0 | 98.9%

The physical shortfall and the blocked-output amount use different units. The model converts between them using each layer's input requirements and the allocation described below.

Source files · shortages_v4.csv (https://metamachine.sukanthoriginal.com/data/shortages_v4.csv)

How this becomes blocked output

The model asks two questions. With the whole target attempted, how much tier-2 output must be removed at precedent input supply? With only on-course output and tier 1 attempted, how much tier-1 output must be removed at on-course supply? It adds the resulting tier-2 and tier-1 blocks for this shortage.

$1.1T tier 2 + $0bn tier 1 = $1.1T blocked

The allocation drops eligible output from the model's most input-intensive layers first and protects the on-course baseline. The ordering is fixed within a test. Labour-dependent requirements are recalculated as output is removed.
Understand the allocation and its limits (https://metamachine.sukanthoriginal.com/guide/methods.html)

See the affected layers

 | Layer | Base output blocked

 | Built structures (https://metamachine.sukanthoriginal.com/guide/layer-c13.html) | $1.1T

Other shortages can block these same amounts. Removing a single constraint leaves the other constraints to be tested.

Source files · own_blocks_v4.csv (https://metamachine.sukanthoriginal.com/data/own_blocks_v4.csv)

What changes the answer?

Each row recomputes the constraint under a different production or demand assumption. The displayed range takes the smallest and largest output blocks across all these rows.

 | Case | What changes | Output blocked

 | base | v3 ratio: identity | $1.1T

This shortage exceeds $1T and has 0 alternative tests. The original brief requested two. The code labels it SCENARIO.

Assumption behind the verdict

fewer than two sourced alternative ways found; rests on the base ratio

See its reported rank in each scenario

 | Scenario | Rank | Output blocked

 | base | 13 | $1.1T

 | AI takes cognitive tasks first | 15 | $1.1T

 | humans keep cognitive tasks | 13 | $1.1T

 | labour productivity on trend | 14 | $1.1T

 | v3 second sourced ratios | 11 | $1.1T

 | 2026 intensities / K-Y trend | 17 | $1.1T

 | land- and approval-saving technology, task reallocation | 12 | $1.1T

The published ranking takes the first matching variant for each scenario. Clinical approval and cropland each have a second S6 variant that appears in the range above and is omitted from those ranking columns.
Read every scenario (https://metamachine.sukanthoriginal.com/guide/scenarios.html)

What evidence would improve this?

Open the Auckland upzoning working paper (Greenaway-McGrevy and Phillips) and OECD housing-supply elasticities by metro weighted by ICP construction spend

Growth and the historical comparison

Auckland 2016 upzoning (+50% consents within 5 years, A4:A05) in the 30% of construction under discretionary permission (A4:A04); outside it current rules permit any amount (Agent 4 capped that part at capacity)

 | Rate | Annual growth

 | Needed to reach the target input | 7.7%

 | Implied by precedent supply | 7.6%

The growth comparison uses a nine-year interval from 2026 to 2035.

Sources and exact values

Source files · shortages_v4.csv (https://metamachine.sukanthoriginal.com/data/shortages_v4.csv) · variants_v4.csv (https://metamachine.sukanthoriginal.com/data/variants_v4.csv) · own_blocks_v4.csv (https://metamachine.sukanthoriginal.com/data/own_blocks_v4.csv)

base · stage1-v3/requirements/requirements.csv (ratio_2035)
Open the input files and source registries (https://metamachine.sukanthoriginal.com/guide/sources.html)
