Rare earths
https://metamachine.sukanthoriginal.com/guide/shortage-k08.html

Magnet rare earths are material inputs used in some motors, generators and other equipment.

Conditional constraint (https://metamachine.sukanthoriginal.com/guide/what-the-numbers-mean.html#constraint)
Calculated output blocked
$0bnin this scenario, one constraint

Range across tested cases
$0bn – $0bn3 cases; not a probability interval

This is a conditional test of the chosen target economy. It does not predict how much GDP will be lost. Changing the target mix, supply assumptions or production method can change the result.
[A] Assumed (https://metamachine.sukanthoriginal.com/guide/evidence.html)not tested (blocks 1T or less) (https://metamachine.sukanthoriginal.com/guide/evidence.html)UNTESTED (https://metamachine.sukanthoriginal.com/guide/evidence.html)

What is being compared?

The requirement is measured in rare-earth-element content. The model uses the inherited substitution approximation when translating the material shortfall into output.

 | Quantity | 2035 amount

 | Needed for the full target | 213.0

 | Supply on course | 136.4

 | Supply at precedent | 709.6

All three use the same input unit — kt magnet rare earth elements per year.

Show the shortage calculation

Input shortage = maximum of zero and requirement minus supply. Coverage = supply ÷ requirement.

 | Supply path | Input shortfall | Full-target need met

 | On course | 76.7 | 64.0%

 | At precedent | 0.0 | 333.1%

The physical shortfall and the blocked-output amount use different units. The model converts between them using each layer's input requirements and the allocation described below.

Source files · shortages_v4.csv (https://metamachine.sukanthoriginal.com/data/shortages_v4.csv)

How this becomes blocked output

The model asks two questions. With the whole target attempted, how much tier-2 output must be removed at precedent input supply? With only on-course output and tier 1 attempted, how much tier-1 output must be removed at on-course supply? It adds the resulting tier-2 and tier-1 blocks for this shortage.

$0bn tier 2 + $0bn tier 1 = $0bn blocked

The allocation drops eligible output from the model's most input-intensive layers first and protects the on-course baseline. The ordering is fixed within a test. Labour-dependent requirements are recalculated as output is removed.
Understand the allocation and its limits (https://metamachine.sukanthoriginal.com/guide/methods.html)

What changes the answer?

Each row recomputes the constraint under a different production or demand assumption. The displayed range takes the smallest and largest output blocks across all these rows.

 | Case | What changes | Output blocked

 | base | v3 ratio: pathway-consistent 2035 (GCMO High Demand, closest to NZE); more mineral per unit than the baseline (CES substitution, elasticity 0.4: v3's missing/output-depending conversion) | $0bn

 | v3alt | v3 second ratio: IEA GCMO 2026 STEPS 2035 path (Agent 4 rerun) (CES substitution, elasticity 0.4: v3's missing/output-depending conversion) | $0bn

 | today | 2026 intensity held (today's technology, no efficiency gain): x0.84 the v3 ratio (CES substitution, elasticity 0.4: v3's missing/output-depending conversion) | $0bn

Assumption behind the verdict

v3 ratio: pathway-consistent 2035 (GCMO High Demand, closest to NZE); more mineral per unit than the baseline (CES substitution, elasticity 0.4: v3's missing/output-depending conversion); v3 second ratio: IEA GCMO 2026 STEPS 2035 path (Agent 4 rerun) (CES substitution, elasticity 0.4: v3's missing/output-depending conversion); 2026 intensity held (today's technology, no efficiency gain): x0.84 the v3 ratio (CES substitution, elasticity 0.4: v3's missing/output-depending conversion)

What evidence would improve this?

IEA Critical Minerals Data Explorer magnet rare-earth end-use split; non-China separation capacity under construction

Growth and the historical comparison

World rare-earth mine output 1960-1969 x7.97 in 9 years (USGS via OWID)

 | Rate | Annual growth

 | Needed to reach the target input | 10.2%

 | Implied by precedent supply | 25.9%

The growth comparison uses a nine-year interval from 2026 to 2035.

Sources and exact values

Source files · shortages_v4.csv (https://metamachine.sukanthoriginal.com/data/shortages_v4.csv) · variants_v4.csv (https://metamachine.sukanthoriginal.com/data/variants_v4.csv) · own_blocks_v4.csv (https://metamachine.sukanthoriginal.com/data/own_blocks_v4.csv)

base · stage1-v3/requirements/requirements.csv (ratio_2035); input_layer_v3.csv (missing, output_depending_ppp_bn)

v3alt · stage1-v3/requirements/requirements.csv (ratio_alt_2035)

today · stage1-v3/repair/agent4_bottlenecks/bottlenecks.csv (K08 supply_2026); 2026 world output (repaired baseline)
Open the input files and source registries (https://metamachine.sukanthoriginal.com/guide/sources.html)
